Observed schedule changes
Daily UK and EU tariff changes
Differences between successive complete captures of the Great Britain schedule and the EU-aligned Northern Ireland schedule. The observed date is separate from legal validity dates. Capture intervals may span more than one day.
An observed date is when the change first appeared in our captures. It is not the date the measure became law or took effect. Check the legal start date and the source before relying on any row.
Change tracking is still gathering captures
At least two complete validated captures are needed before observed changes can be reported.
No complete captures have been recorded yet. No change figures are shown until comparisons can be made.
Look up a commodity in the current schedules or read how captures are compared.
How changes are detected
- Each day we capture the GB and NI schedules. A change is recorded only when two consecutive complete captures differ for a measure.
- Introduced: a measure appears. Amended: its duty, dates or area differ. Withdrawn: it disappears before its legal end date. Expired: it reached its legal end date.
- The observed date reflects our capture timing; the legal start and end dates come from the source schedule and may be in the past or future.
- Counts are of measures, not tariff rates or levels of protection.